Skip to content
Code Violation Solverby 360 Home Improvements · CBC1267336 · CCC1335340Call

How do I permit work that's already done?

A step-by-step checklist for work done without a permit, from gathering what exists to the final inspection and closing the code case. Tell it what was built and it drops the steps that don't apply. Tick as you go and print it. It runs in your browser: nothing you enter is sent anywhere.

Florida · general information

What was done without a permit?

Tick everything that applies. It tailors the checklist; leave it blank to see every step.

Broward and Miami-Dade add High-Velocity Hurricane Zone steps for roofs, windows and doors.

Do you have a code enforcement notice about it?
Is any of the work now hidden behind drywall, ceilings, floors or stucco?

Your answers and ticks are kept in this browser on this device only, so you can come back to them. Nothing is sent anywhere.

Your checklist

None of the 41 items done yet.

Next: Find the notice. Write down the case number, the compliance date, and the inspector's name and phone number.

  1. Step 1: Gather what exists

    0 of 7 done

    Start with what's already on paper. It shapes the application and can save time later.

    • Work out the days you have with the deadline checker

    • Find your city’s online portal by county

    • They help the contractor and the inspector understand what's there. Whether photos are accepted in place of opening something up is the building department's call.

    • Florida's product approval system covers windows, exterior doors, shutters and roofing (section 553.842, Florida Statutes).

  2. Step 2: Ask what will be accepted

    0 of 5 done

    Before anyone draws or builds anything, find out what the building department will need, and what the code office will accept if you have a case.

    Worth knowing: If a stop work order is posted on the property, don't continue the work until the building department lifts it.

  3. Step 3: Have a licensed contractor assess it

    0 of 5 done

    A licensed contractor compares what was built with the code and with what the city has on file.

    • Open the DBPR license search (opens in a new tab)

    Worth knowing: Don't have unlicensed help fix it. The city needs to see permitted, inspected work, and more unpermitted work adds to the problem.

  4. Step 4: Drawings and documents

    0 of 4 done

    The building department reviews the work as built, usually from drawings. What it asks for depends on the job.

  5. Step 5: Apply for the permit

    0 of 5 done

    The contractor applies for the work as it was built, with the drawings and documents.

  6. Step 6: Inspections

    0 of 4 done

    Each inspection the permit lists has to pass. With work that's already finished, the inspector may need to see what's now covered up.

    • Section 110.1 of the Florida Building Code says work that needs a permit must stay exposed for inspection until it is approved, and that the city isn't responsible for the cost of opening up and closing finishes for an inspection, so build it into the scope.

    Worth knowing: Keep it moving: permits expire. For a single-family home, Florida law says a building permit expires 1 year after it is issued, or when the next edition of the Florida Building Code takes effect if that is later, and the building department can extend it (section 553.79(1)(c), Florida Statutes). Ask your building department when yours expires and what keeps it active.

  7. Step 7: Corrections

    0 of 4 done

    Anything that doesn't meet the code is corrected under the permit, then reinspected.

  8. Step 8: Final inspection

    0 of 3 done

    The permit closes when the final inspection passes.

  9. Step 9: Close the case and keep the records

    0 of 4 done

    Passing final is usually what the code office needs to confirm compliance, but a case isn't closed until the code office closes it.

Not sure the work needed a permit? Check the job in the permit checker.

This is general information, not legal advice. Your building department decides what can be permitted, and the code office named on your notice decides when a case is closed. Legal questions go to a Florida attorney.

Have 360 Home Improvements take it through

360 Home Improvements is a licensed Florida contractor, Certified Building Contractor CBC1267336 (verify on the state’s DBPR search (opens in a new tab)). We compare what was built with the city’s records, prepare the after-the-fact permit application and drawings, with a Florida-licensed engineer or architect where the building department requires one, open up and close finishes where the inspector needs to see covered work, make the corrections and take the permit through final inspection. Electrical, plumbing and AC work goes to our Florida-licensed subcontractors, who pull that trade’s permit. The building department makes the final call on what can be permitted. The request form opens with “Work done without a permit” selected.

How this works

In Florida, section 105.1 of the Florida Building Code asks for a permit before work starts. When work was done without one, the usual path is an after-the-fact permit: find out what the building department and, if there's a case, the code office will accept; have a licensed contractor assess the work; prepare drawings and documents; apply; pass the inspections, which may mean opening walls or ceilings so covered work can be seen; make any corrections; pass the final inspection; then tell the code office and keep the records.

The checklist follows that path. What you tick about the work, the county and your case adds or drops steps: product approvals for windows, doors, shutters and roofing, the High-Velocity Hurricane Zone steps in Broward and Miami-Dade, trade permits for electrical, plumbing and AC work, and the code-case steps. Your building department decides what can be permitted, and the code office named on your notice decides when a case is closed.

It runs in your browser and nothing you enter is sent anywhere. It is general information about how code enforcement usually works in Florida, not legal advice. Your notice, your city or county’s code and the code office named on the notice are what count. For legal questions, talk to a Florida attorney.

Questions people ask

What is an after-the-fact permit?
A permit applied for after the work is already done. A licensed contractor applies for the work as it was built, usually with drawings, and the building department reviews and inspects it. Anything that doesn't meet the code is corrected under the permit, and the permit closes when the final inspection passes. Where work can't be permitted, removing it can be the answer instead. The building department decides which applies.
Will they make me open up walls or ceilings?
It depends on what the inspector needs to see. Section 110.1 of the Florida Building Code says work that needs a permit must stay exposed for inspection until it is approved, so framing, wiring or plumbing that is now hidden may need openings in drywall, ceilings or stucco. Some building departments may accept other evidence for some of it, such as photos or a Florida-licensed engineer's report. That's their decision.
Does an after-the-fact permit cost more than a normal permit?
It can. Section 109.4 of the Florida Building Code lets the building official set an added fee, on top of the normal permit fees, for work started before a permit was issued. Fee amounts are set by each building department, so ask yours.
Is unpermitted work the same as an open permit?
No. Unpermitted work never had a permit. An open permit was issued but never closed with a final inspection, often because inspections stopped. Florida law has its own rules for closing open permits, including letting the owner hire a different licensed contractor to finish and close one (section 553.79(16), Florida Statutes). Both show up in permit searches, and both are worth sorting out before a sale.
Will this close my code case and stop the fines?
Passing final inspection on the permit is usually what the code office needs to confirm compliance, but closing the case is the code office's decision, and how any fine or lien is handled is up to the city or county. Nobody can promise an outcome. Ask the code enforcement office named on your notice, and talk to a Florida attorney for legal questions.
Is my progress saved?
Your answers and ticks are kept in this browser on this device only, so you can come back to the checklist. Nothing is sent anywhere. Use “Clear my progress” to remove them, or print the checklist to keep a copy.

Other free tools

Have 360 Home Improvements look at it

360 Home Improvements is a licensed Florida contractor: Florida Certified Building Contractor CBC1267336 · Certified Roofing Contractor CCC1335340. Tell us what the notice says and request a free estimate for the work it calls for.

Call (954) 906-7864

Call us or send your notice details